Decoration contract needs to pay special attention

2022-07-22
  • Detail

Decoration contracts need to pay special attention to seven aspects

>& gt;& gt; Six elements make it easy for you to sign the decoration contract

when signing the decoration contract, you should pay attention to the following aspects:

1. Duration agreement: generally, for a room with 2 bedrooms and 100 square meters, if it is simply decorated, the duration is about 35 days. For insurance, the decoration company will generally agree the duration to 45-50 days. If you are anxious to check in, you can discuss this clause with the designer when signing

2. Payment method: in general decoration contract, it is agreed that the down payment is 60%, 35% will be paid after woodworking acceptance, and 5% will be paid after completion. If you follow this form of payment, you will have paid about 95% of the cost to the decoration company after about half of the construction period. If there is any problem in the later stage of decoration, it is difficult to restrict the decoration company in terms of money. Therefore, it is suggested that when signing the contract, the down payment should be reduced to 30% and the interim payment should be 30%

interim payment: generally, the interim payment time agreed in the contract is simply marked as "more than half of the project, woodworkers close". However, a construction site is often multi project cross operation, and more than half of the formal construction period should be: the completion of woodwork production; Kitchen and bathroom walls, floor tiles and ceilings are finished; End of wall leveling; The electric transformation is over

3. Increase or decrease items: during the decoration process, it is easy to increase or decrease items, such as making more cabinets, changing more water circuits for several meters, etc. These fees should be paid at the time of completion. How much should the unit price of these items be? If we wait until the construction has started, it may be the design. Therefore, if possible, it is best to copy a complete quotation originally shown to you by the decoration company, so as to avoid the decoration company changing the price when signing the contract or increasing or decreasing the project

also note that when you finally settle the expenses, the increase and decrease expenses you should pay should be signed by you before the construction of the project. If you do not sign for approval, you can not pay the corresponding expenses

4. Warranty terms: the whole process of decoration is still mainly manual on-site production, which has not been fully industrialized, so it is inevitable that there will be various fine quality problems. Within the warranty period, the responsibility that decoration companies should implement is particularly important. For example, if something goes wrong, whether the decoration company is fully responsible for the warranty of labor and materials, or only labor and not responsible for the warranty of materials, or there are other restrictive clauses, these must be clearly written in the contract

5. Water and electricity costs: during the decoration process, water, electricity, gas, etc. will be used for on-site construction. Generally, by the end of the project, the water and electricity charges add up to a large number. Who should pay this cost should also be indicated in the contract

6. Construction according to drawings: strictly follow the drawings you signed and approved. If the details and dimensions are inconsistent with your design drawings, you can request rework

7. Arrival time and times of supervision and quality inspection: general decoration companies assign the project to each construction team to complete. Quality inspectors and supervisors are the most important supervision means for decoration companies. The time interval of their arrival inspection is particularly important to the quality of the project. Supervisors and quality inspectors should be present every two days. The design should also be present once every 3-5 days to see whether the on-site construction results are consistent with their own design